Setup
This document covers the SLURM installation and configuration for shared use of the cluster workstation.
Enforcement
This document explains how to configure the workstation to enforce SLURM usage for compute jobs. Non-SLURM compute processes running longer than 5 minutes will be automatically terminated.
Adding a Node
This document provides a step-by-step guide for adding a new compute node to the existing SLURM cluster.
GPU Expansion
This page documents the full process of adding a second NVIDIA RTX PRO 6000 Blackwell Max-Q Workstation Edition GPU to the node01 control node, including hardware verification, driver/CUDA compatibility checks, SLURM reconfiguration, and Grafana/Prometheus monitoring updates.